Murphy Bridge Grand Opening Celebration
Thursday, November 18, 2021
Download a flyer with infographic and photos.
PROJECT UPDATES |
CORRIDOR IMPROVEMENTS |
SIGN UP FOR NOTIFICATIONS |
CONSTRUCTION UPDATE - BROSTERHOUS ROAD
The City of Bend will begin additional construction on a sidewalk and sewer extension project under the railroad bridge on Brosterhous Rd. between Murphy Rd. and Knott Rd. This project is estimated to begin in Mid-October with estimated completion in late spring of 2022.
The project includes installation of a shared use path sidewalk for pedestrians and bikes under the railroad bridge that will connect to existing sidewalks to the north and south. Also included in the work is an extension of the sewer line within Brosterhous Rd.
Road and lane closures will be required during construction:
- A one-week full road closure of Brosterhous Rd. to vehicle traffic at the railroad crossing between Murphy Rd. and Knott Rd. will be required. Use signed detour.
- The northbound lane of Brosterhous Rd. will remain closed to vehicle traffic through the end of
December. - Access to pedestrians and bikes will remain open during both the full road and lane closures
- During construction, heavy equipment will be operating close to residences. Please stay safe and keep children and pets away from the construction area.
- Detour includes Murphy Rd., Country Club Dr. and Knott Rd.
Learn more details about this Brosterhouse safety and accessibility project.
WORK COMPLETED TO DATE
Corridor Study completed: 2008 (construction funding reprioritized and project postponed)
Murphy Road Interchange completed: 2015
City Council approves project funding: June 2018
City Council awards preconstruction design contract to K&E/Hamilton: December 2018
Waterline Loop completed: July 2019
15th Street Roundabout completed: October 2019
UPCOMING PROJECT MILESTONES
- Fall 2020-Fall 2021: Roadway extension between Brosterhous Road and 15th Street with a bridge overcrossing at BNSF Railway
PROJECT LOCATION
PROJECT BENEFITS
|
|||
|
|||
|