Murphy Corridor Improvements

Print
Share & Bookmark, Press Enter to show all options, press Tab go to next option

 crowd of people at the Murphy bridge opening celebration

Murphy Bridge Grand Opening Celebration

Thursday, November 18, 2021

Download a flyer with infographic and photos.


 


Construction icon.

PROJECT
UPDATES
Meetings icon.

CORRIDOR IMPROVEMENTS
Add user icon.

SIGN UP FOR
NOTIFICATIONS

Calendar icon.

PROJECT
BENEFITS


CONSTRUCTION UPDATE - BROSTERHOUS ROAD

The City of Bend will begin additional construction on a sidewalk and sewer extension project under the railroad bridge on Brosterhous Rd. between Murphy Rd. and Knott Rd. This project is estimated to begin in Mid-October with estimated completion in late spring of 2022.

The project includes installation of a shared use path sidewalk for pedestrians and bikes under the railroad bridge that will connect to existing sidewalks to the north and south. Also included in the work is an extension of the sewer line within Brosterhous Rd.

Road and lane closures will be required during construction: 

  • A one-week full road closure of Brosterhous Rd. to vehicle traffic at the railroad crossing between Murphy Rd. and Knott Rd. will be required. Use signed detour.
  • The northbound lane of Brosterhous Rd. will remain closed to vehicle traffic through the end of 
    December.
  • Access to pedestrians and bikes will remain open during both the full road and lane closures
  • During construction, heavy equipment will be operating close to residences. Please stay safe and keep children and pets away from the construction area. 
  • Detour includes Murphy Rd., Country Club Dr. and Knott Rd.

Learn more details about this Brosterhouse safety and accessibility project.

 

A cross section exhibit of the bridge overcrossing at BNSF Railway, depicting two travel lanes, two bike lanes with buffers, and a shared use path and sidewalk with hanrail and fence.A cross section exhibit of the modernization between Country Club Drive & Parrell Road, depicting a shared-use path, landscape varies, bike lanes, travel lanes, a sidewalk, and a two-way left turn lane.

WORK COMPLETED TO DATE

Corridor Study completed: 2008 (construction funding reprioritized and project postponed)

Murphy Road Interchange completed: 2015

City Council approves project funding: June 2018

City Council awards preconstruction design contract to K&E/Hamilton: December 2018

Waterline Loop completed: July 2019

15th Street Roundabout completed: October 2019

 

UPCOMING PROJECT MILESTONES

  • Fall 2020-Fall 2021: Roadway extension between Brosterhous Road and 15th Street with a bridge overcrossing at BNSF Railway

PROJECT LOCATION

Murphy corridor project completion of all sections including the murphy bridge over the railroad November 2021 


PROJECT BENEFITS

Mobility icon.

Mobility

Addition of railway overcrossing to reduce delays and significantly improve emergency medical services and fire response times for citizens.
Road icon.

Connectivity

Improved traffic connectivity to adjoining streets, parks, and schools.
Siren icon.

Safety

Improved visibility at intersections and designated crossings, reduced conflict points for vehicles, bicyclists, and pedestrians.

PROJECT UPDATES

Murphy Corridor Improvements Project Update - May 10, 2021

Post Date:05/13/2021 12:23 AM

Thank you for your interest in the Murphy Corridor Improvements Project.

Week of May 10 Construction Activities

  • Crews will pour concrete for the west bridge abutment walls on the extension of Murphy Road over the BNSF Railway. The work is expected to take place on Tuesday, May 11, and requires extended work hours between 5:00 AM and 6:30 PM
  • Preparation work will continue in advance of the paving of Murphy Road.
  • Sidewalks and driveway work continues.
  • Landscape and irrigation work will continue.

An interactive map of closures and detours can be found online at www.bendoregon.gov/traffic.

Traffic Reminder

The south and east leg of the Murphy Road/Country Club Drive roundabout are open. Murphy Road is one way from Country Club Drive to Parrell Road (local access only).

Westbound Detour: Take Murphy Road to Country Club Drive. Turn right on Knott Road. Turn right on China Hat Road. Turn right on Parrell Road.

Eastbound Detour: Take Murphy Road to Parrell Road. Continue on Parrell Road, turn right on Brosterhous Road, and follow to stop sign. Turn right on Brosterhous Road and follow through Brosterhous Roundabout to Murphy Road.

An aerial photo of Murphy Road looking west.
Above: Murphy Road Looking West

An aerial photo of the abutment on the west side of the BNSF railroad.
Above: Abutment on the west side of the BNSF Railroad

A photo of the rebar in the abutment.
Above: Rebar in abutment

Please contact the project team with concerns, comments, and questions at (541) 322-9919. 

Accommodation Information for People With Disabilities

Sign language interpreter service, assistive listening devices, materials in alternate formats such as Braille, large print, electronic and CD formats, or any other accommodations are available upon advance request. To obtain this information, please contact the project team at MurphyProjectTeam@bendoregon.gov or (541) 322-9919; Relay Users Dial 7-1-1, and (541) 385-6676. 

Return to full list >>

SIGN UP FOR PROJECT UPDATE NOTIFICATIONS

DOCUMENTS

Footer Broken Top Three Sisters

Free viewers are required for some of the attached documents.
They can be downloaded by clicking on the icons below.