BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//City of Bend - ECPv6.15.17.1//NONSGML v1.0//EN
CALSCALE:GREGORIAN
METHOD:PUBLISH
X-ORIGINAL-URL:https://bendoregon.gov
X-WR-CALDESC:Events for City of Bend
REFRESH-INTERVAL;VALUE=DURATION:PT1H
X-Robots-Tag:noindex
X-PUBLISHED-TTL:PT1H
BEGIN:VTIMEZONE
TZID:America/Los_Angeles
BEGIN:DAYLIGHT
TZOFFSETFROM:-0800
TZOFFSETTO:-0700
TZNAME:PDT
DTSTART:20110313T100000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:-0700
TZOFFSETTO:-0800
TZNAME:PST
DTSTART:20111106T090000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:-0800
TZOFFSETTO:-0700
TZNAME:PDT
DTSTART:20120311T100000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:-0700
TZOFFSETTO:-0800
TZNAME:PST
DTSTART:20121104T090000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:-0800
TZOFFSETTO:-0700
TZNAME:PDT
DTSTART:20130310T100000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:-0700
TZOFFSETTO:-0800
TZNAME:PST
DTSTART:20131103T090000
END:STANDARD
END:VTIMEZONE
BEGIN:VEVENT
DTSTART;TZID=America/Los_Angeles:20120607T170000
DTEND;TZID=America/Los_Angeles:20120607T190000
DTSTAMP:20260406T063247
CREATED:20251203T235019Z
LAST-MODIFIED:20251203T235019Z
UID:10000453-1339088400-1339095600@bendoregon.gov
SUMMARY:Simpson/Mt Washington Pre-construction Open House
DESCRIPTION:Public meeting to be held for Simpson Ave. /Mt. Washington Drive roundabout construction  \nThe City of Bend is holding a pre-construction open house for the new roundabout planned at Simpson Ave. and Mt. Washington Dr. The meeting will take place Thursday\, June 7 from 5 to 7 p.m. in the City Council Chambers at Bend City Hall\, 710 NW Wall St. No formal presentation is planned; the public is invited to drop in at any time.  \nConstruction of the new roundabout is scheduled to begin in mid-June and continue until this October. A signed\, temporary detour route will be in place during that time to allow the contractor full access to the site. The Simpson Ave. /Mt. Washington Dr. roundabout is the first project to be constructed from the 2011 transportation General Obligation (G.O.) Bond program. Total project cost is $3 million.  \nThe G.O. Bond program is a voter-approved package of street and intersection improvements located throughout the city. The bond measure authorized $30 million for eight separate projects which were selected based on known safety and congestion issues\, geographic location\, and the opportunity to provide local construction jobs. Construction will take place through 2014.  \nFor more information\, visit www.bendoregon.gov/GOBond.
URL:https://bendoregon.gov/event/simpson-mt-washington-pre-construction-open-house/
LOCATION:City Hall\, City Council Chambers\, 710 NW Wall Street\, Bend\, 97701\, United States
END:VEVENT
END:VCALENDAR