City of Bend
Home MenuKing Hezekiah Fargo Septic to Sewer Project
A Septic to Sewer Conversion Program Project
Residents applied to the City of Bend Septic to Sewer Conversion Program to install public sewer in their neighborhoods.The following application areas were approved for design and construction as the King Hezekiah and Fargo Sewer Project (1SN09):
Gravity and pressure sewer mains (as applicable to the project area) will be constructed in each of the application areas. Sewer laterals will be installed to every tax lot in the area to allow approximately 42 properties to decommission their septic systems and connect to the public sewer system. Construction will be completed in phases. Franchise utility relocation work may begin as early as Summer 2025 (residents will be notified in advance of any relocation work). The City of Bend Septic to Sewer portion of construction will take place throughout 2026*.
Public Meeting
- Date to be determined
Estimated Project Schedule*
- Committee Selection of the Project - October 2024
- Project Design – 2024-2025*
- Franchise Utility Relocation Work - summer/fall/winter 2025 (natural gas, power, cable, etc.)
- Construction - 2026*
*Schedule dates are estimates and subject to change.
Project Background
Residents in the project areas applied to the City of Bend Septic to Sewer Conversion Program to install public sewer in their neighborhoods. On October 28, 2024, the City of Bend Community Building Subcommittee approved the design and construction of the sewer in the following areas.
- King Hezekiah
- Fargo Lane #2 (South)
More information about the Septic to Sewer Program (fees, other projects, permits, etc.) is available online at www.bendoregon.gov/septictosewerprogram.
This project is funded by the Clean Water State Revolving Fund (CWSRF) and President Joe Biden's bipartison Infrastructure Law.