Materials and Reports

Share & Bookmark, Press Enter to show all options, press Tab go to next option
Print

Email Updates 
Email Update - November 2012
Email Update - April 2012
Email Update - March 29, 2012
Email Update - March 2012
Email Update - January 2012

Public Outreach 
Public Outreach Summary - May 2012

City Council 
Project Briefing Notebook* - December 18, 2012 (37 MB)
*Please Note: The Briefing Notebook is a large document,
  therefore it is also available in two parts:  Part 1(13MB), Part 2(20MB)
City Letter to State - LT2 Compliance Issues - January 9, 2012

Project Reports and Studies 
Assessment of the Surface Water Improvement Project on Tumalo Creek Water Temperatures - Draft Technical Memo – March 13, 2012 (1.3 MB) 
Tumalo Creek Instream Flow Study - Draft Technical Memo – March 13, 2012 (3.2 MB) 
Tumalo Creek Instream Flow Study Attachment A - Transect Photos – March 13, 2012 (4.4 MB) 
Tumalo Creek Instream Flow Study Attachment B - PHABSIM Hydraulic Calibration Report – March 13, 2012 (481 KB) 
Tumalo Creek Instream Flow Study Attachment C - Channel Flow-Response Charts – March 13, 2012 (1.7 MB)
Historical Evaluation of the Intake Facility
(3 MB)
Timing of Hydro Project - Preliminary Report - February 2012 
Value Engineering Study - March 2011 (14.8 MB) 

Forest Service Documents 
Bridge Creek Pipeline Proposed Special Use Permit: Environmental Assessment and other Forest Service documents
Temporary Road and Trail Closure Map - 2012
FS Trail and Road Closure Press Release - Sept 2012
Decision Notice Special Use Permit: City of Bend Bridge Creek Water Supply System – July 10, 2012 
Forest Service Response to Public Comment – July 5, 2012 
Errata to Revised Environmental Assessment – July 2012
Revised Evironmental Assessment of City of Bend, Bridge Cr. Water Supply System (June 30, 2012 Revised)
City of Bend Memo Re: Public Comment – May 30, 2012
Second 30-day Comment Period Notification (PDF 125kb)
Public Notification of 30-day Comment Period (PDF 149kb) 
Invitation to Comment through June 6, 2011 - U.S. Forest Service - April 28, 2011 (includes exhibits)
City of Bend, Bridge Cr. Water Supply System Environmental Assessment 3.13.12 (PDF 3747kb)
(link to Forest Service Website for more documents)

Archive
Archived Reports




Free viewers are required for some of the attached documents.
They can be downloaded by clicking on the icons below.

Acrobat Reader Flash Player QuickTime Windows Media Player Microsoft Silverlight Word Viewer Excel Viewer PowerPoint Viewer

If you need assistance with any document, form, etc.,
you may request assistance from the Accessibility Program.