This study evaluated options for a new interchange at the north end of Bend. The purpose was to develop project concepts that enhance safety and operations on US 97 and the local street network while improving connectivity and access to residential and commercial uses along US 97.

A potential interchange would connect to the US97 Bend North Corridor project and would provide for a future connection to 18th Street to serve the Juniper Ridge site and areas in northeast Bend.

The Bend MPO Policy Board provided oversight of this project and served as an information conduit to the Bend City Council and Deschutes County Commission.

 


STUDY AREA

North 97 interchange study area.

ODOT North US97 Interchange Study Project Information (One pager - project information sheet)

Final Report 2/5/2021


PROJECT MEMOS

Footer Broken Top Three Sisters

Free viewers are required for some of the attached documents.
They can be downloaded by clicking on the icons below.

Acrobat Reader Flash Player QuickTime Windows Media Player Microsoft Silverlight Word Viewer Excel Viewer PowerPoint Viewer

If you need assistance with any document, form, etc.,
you may request assistance from the Accessibility Program.