Collection System Master Plan 2007 - Archived
Printed copies are available for all or part of the Sewer Collection System Master Plan at: Central Oregon Builders Exchange (541) 389-0123.
CSMP Addendum #4
CSMP Addendum #3
Technical Memo 1.5 | Fig. 1 | Fig. 2 | Fig. 3 |
CSMP Addendum #2
- Draft Collections Systems Report - Dec 2007
- Collection System Report Final - July 2008
- Refined Master Plan Improvements and Costs - Dec 2007
- Alternative Analysis Criteria
Fig. 17 North |
Fig. 17 South |
Fig. 17-A 2030 CIPs |
Fig. 18 North |
Fig. 18 South |
Fig. 18-A Build-Out |
CSMP Addendum #1
Collection System Master Plan Report*
Collection System Master Plan Study Area Plans 2007
(9 Study Area Plans Total)
Area 1 Plan |
Area 2 Plan |
Area 3 Plan |
Area 4 Plan |
Area 5 Plan |
Area 6 Plan |
Area 7 Plan |
Area 8 Plan |
Area 9 Plan |
Technical Memorandums
TM 3-A |
TM 3.1 |
TM 3.2 |
TM 3.3 |
TM 3.4 |
TM 3.5 |
TM 3.6 |
TM 3.7 |
TM 3.8 |
TM 3.9 |
TM 3.10 |
2007 RFQ Reference Documents
- SE Interceptor Preliminary Evaluation-Final
- SE Interceptor
- SE Interceptor Recommended Alternative Report - April 2008 (64MB)
Public Comment Period concluded January 26, 2007
If you have questions regarding the public comments received you may contact:
Heidi Lansdowne, PE
City of Bend Public Works
541-317-3000
- Please email your inquiries to: hlansdowne@ci.bend.or.us