Archives- Collection System Master Plan

Share & Bookmark, Press Enter to show all options, press Tab go to next option
Print

Collection System Master Plan 2007 - ArchivedCollection System Master Plan graphic

Printed copies are available for all or part of the Sewer Collection System Master Plan at:  Central Oregon Builders Exchange (541) 389-0123. 

CSMP Addendum #4

CSMP Addendum #3

       Technical Memo 1.5  Fig. 1  Fig. 2  Fig. 3 

CSMP Addendum #2

      Fig. 17
North
 
Fig. 17
South
 
Fig. 17-A
2030 CIPs
 
Fig. 18
North
 
Fig. 18
South 
Fig. 18-A
Build-Out 

 

CSMP Addendum #1 

Collection System Master Plan Report* 

Collection System Master Plan Study Area Plans 2007Study Areas Map

(9 Study Area Plans Total)

Area 1
Plan
 
Area 2
Plan
 
Area 3
Plan
 
Area 4
Plan 
Area 5
Plan 
Area 6
Plan
 
Area 7
Plan
 
Area 8
Plan
 
Area 9
Plan 


Technical Memorandums

TM
3-A
 
TM
3.1
 
TM
3.2
 
TM
3.3
 
TM
3.4
 
TM
3.5
 
TM
3.6 
TM
3.7 
TM
3.8 
TM
3.9 
TM
3.10
 

 

2007 RFQ Reference Documents

Public Comment Period concluded January 26, 2007

If you have questions regarding the public comments received you may contact:

Heidi Lansdowne, PE
City of Bend Public Works
541-317-3000

 

Free viewers are required for some of the attached documents.
They can be downloaded by clicking on the icons below.

Acrobat Reader Flash Player QuickTime Windows Media Player Microsoft Silverlight Word Viewer Excel Viewer PowerPoint Viewer

If you need assistance with any document, form, etc.,
you may request assistance from the Accessibility Program.