Admiral & King Jehu Sewer Project Update – April 26, 2022

TENTATIVE CONSTRUCTION ACTIVITIES (KING HEZEKIAH WAY & KING JEHU WAY)

  • In general, construction sequencing will begin on King Hezekiah Way, followed by King Jehu Way, and then on Admiral Way.
  • Locate markings are painted on the ground, indicating where underground utilities are located.
  • Survey staking is ongoing; please do not move or remove any wooden survey stakes.
  • Minor tree trimming activities and clearing will occur as needed.
  • Pre-hammering and trench excavation are ongoing.
  • Sewer main and lateral installation will begin this week. Sewer lateral locations should be finalized.
  • Work on King Jehu will begin this week – please see updated traffic control below.

PROJECT PHOTO

Below is a photo showing a maintenance hole, pipe installation, and a trench box. The trench box protects workers when working in deep excavation areas. Expect to see this in your neighborhood within the coming weeks.

A photo of a working crew member working in a trench box to install a maintenance hole and pipe in a deep trench.

TRAFFIC CONTROL

Traffic control signs have been staged on King Hezekiah and are ongoing. The map provided below shows the closure area (solid red line) and detour (blue dashed line). Local access will be provided on King Hezekiah Way and King Solomon Court for homeowners living on those streets. Please proceed with caution when driving in the construction zone.

A map of the traffic control plan depicting the road closure on King Hezekiah & King Jehu, and the detour route on King Hezekiah & King David. 

Road Closed to Thru Traffic / Local Access Only

Local traffic (meaning homeowners who live adjacent to the construction zone) can drive past this sign to access their driveways/homes. Please use extreme caution when driving in the construction zone.

A photo a barricade, cones, and road signs marking the road closure to thru traffic and local access only. 

RESOURCES

PROJECT CONTACT

Alex Doza, P.E., Assoc. DBIA | City of Bend, Project Engineer – adoza@bendoregon.gov or 541-678-2597

View All News