Weekly Road and Traffic Report for the Week of April 7-13

For the Week of April 7-13:

  • Olney Pedestrian & Bicycle Improvements – This project will install updated bicycle & pedestrian infrastructure along Olney Avenue and Portland Avenue between the Portland Avenue bridge and Second Street. Replacement sewer and water mains will also be installed with this project. The work began Feb. 3 – Fall 2025. For more information, visit the Olney Pedestrian & Bicycle Improvements Project website. A full intersection closure (with detour) will occur to begin the project with the closed street sections listed below.
    • NW Wall Street between NW Revere Avenue and NW Lafayette Avenue.
    • NW Portland Avenue between NW First Street and NW Wall Street.
    • NW Olney Avenue between NW Wall Street and NE Second Street (including intersection).
  • Awbrey Butte Waterline Improvements Project, Phase 2 – This project will provide water distribution system upgrades to the Awbrey Butte area with eight interrelated water improvement subprojects. For more information, visit the Awbrey Butte Waterline Improvements Project website.
    • Portland Avenue from Ninth Street to First Street: Full road closure and local access only lasting through winter. Detour to use Ninth Street to Newport Avenue to Wall Street.
    • Ninth Street to Portland Avenue: Work under flagging for the installation of catch basins. To be determined on exact date – weather dependent.
  • Midtown Crossing Project (Second Street work) – A multiphase project that will replace the water main from Greenwood Avenue to Franklin Avenue in preparation for the full reconstruction occurring next spring. Phase 2 – 4 occurs from Oct. 21 – Spring 2025. Southbound lane closure with local access will occur in its entirety. Current road section work listed below. For more information, visit the Midtown Crossing Project website.
    • Second Street between NE Irving Avenue and NE Greeley Avenue.
  • Country Club Drive between High Lead Drive and Mountain High Loop will have a gas main installation, single lane closure with lane shift, April 7 – 11, 8:30 a.m. – 4:00 p.m.
  • NW Congress Street between NW Tumalo Avenue and NW Idaho Avenue and NW Idaho Avenue Southeast of NW Congress Street for tree removal, full closure with detour, April 7-8.
  • NW Harriman Street between NW Kearney Avenue and NW Greenwood Avenue for infrastructure work associated with the Deschutes County Courthouse, full road closure, began July 24, 2024
  • SE 27th Street between Stevens Road and Ferguson Road for sewer main and roundabout construction, full road closure with bypass road, Completion spring 2025
  • NE Empire Avenue between Plateau Drive and through Lower Meadow Drive for franchise utility work, bike lane and shoulder closure on the south side of eastbound NE Empire Avenue and four-way flagging at the intersection of NE Empire Avenue and Layton Avenue, March 24-April 11.
  • NE Cooley Road between Highway 97 and Hunters Circle, flagging for utility installation, March 27.
  • NE Brinson Boulevard between NE 18th Street and NE Butler Market Road for sidewalk reconstruction, lane shift for a shoulder closure on either side of the NE Brinson Boulevard bridge, March 12 – April 11 8:30 a.m.-4 p.m.
  • NE Cooley Road sidewalk closure on the north side of the street between NE 18th Street and Ranch Village Drive for the construction of NE Andesite Street, March 17 through late May 2025.

Future Road Closures:

  • Intersection of Deschutes Market Road and NE Yeoman Road for roundabout construction, full road closure with detour, April 14th – July 2025
  • City of Bend Street Paving – The City of Bend Transportation and Mobility Department (TMD) will be doing some street paving on Bend’s westside. Expect road closures with local access for the duration of work. Work is anticipated to begin April 14th. Affected Roads listed below:
    • NW 15th Street between NW Ithaca Avenue and NW Kingston Avenue
    • NW Jacksonville Avenue between NW 15th Street and NW Kingston Avenue
    • NW Lexington Avenue between NW 14th Street and NW Kinston Avenue
    • NW Union Avenue between NW Newport Avenue and NW Lexington Avenue
    • NW Cumberland Avenue between NW 14th Street and NW 15th Street
  • Bend Marathon (special event) – This special event includes a 5K, 10K, half & full marathon. The event will use City streets with various road closures and flagging within Northwest Bend. Expect various detours and delays. Event to take place April 13
  • 2025 Salmon Run (special event) – This special event includes a 5K, 10K, and half marathon. The event will primarily use City sidewalks and BPRD trails, crossing a higher-classification street with the use of certified flaggers (streets listed below). Event to take place April 19
    • NW Galveston Avenue between NW Harmon Boulevard and NW Riverfront Street

Work schedules are dependent on weather conditions and other factors. Always exercise increased caution within construction zones. Drivers should use designated detour routes. Nearby residential streets are for local traffic only.

 

Any road closure not listed within this report, please submit a service request to notify the city of any potentially unpermitted work within City right of way. Please visit the Transportation and Mobility Department to submit.


Contact:

Alex Pelayo, Project Engineer

541-323-8556, apelayo@bendoregon.gov

For Street Preservation related questions:

Paul Neiswonger, Streets Supervisor

541-317-3035, pneiswonger@bendoregon.gov


Closures and detours in Bend are updated weekly at: bendoregon.gov/traffic

Find more information about street operations at: bendoregon.gov/streetpreservation

Weekly reports can be received via email by subscribing to Weekly Road and Traffic Reports at: bendoregon.gov/enews


Accommodation Information for People with Disabilities

 

Wheelchair

To obtain this information in an alternate format such as Braille, large print, electronic formats, etc. please contact Jacob Larsen at 541-647-0696 or jlarsen@bendoregon.gov.

View All News