Weekly Road and Traffic Report for the Week of March 29 – April 4:

For the Week of March 29 – April 4:

  • NW Skyliners – Mt Washington Intersection – Closed for roundabout reconstruction and pedestrian crossing updates from March 29th – April 23rd. For further information on this and future street preservation work, visit bendoregon.gov/departments/streets/street-operations/street-preservation-program.
  • NW 9th street between NW Portland Avenue and NW Ogden Avenue for potholing activities related to Newport Corridor project, full road closure with detour, 3/31/21, 8 a.m. – 3 p.m.
  • NW York Drive between NW Clearwater Drive and NW Charbonneau Street for waterline removal and installation, full road closure with local access, 3/22/21 – 4/2/21
  • McClain Drive between NW Shevlin Park Road and NW Shevlin Meadow Drive for infrastructure installation, work began 11/30/20
  • SW Colorado – Columbia intersection – Closed for Roundabout construction beginning March 1st – mid-May. Additional road closures related to closure listed below. For further information, visit bendoregon.gov/Columbia-roundabouts.
    • Colorado Avenue between SW Emkay Drive (west) and SW Emkay (east)
    • SW Columbia Avenue closed between SW Emkay Drive and SW Disk Drive
  • Desert Woods Neighborhood Extension Project – Roads closed for Sewer main installation with local access, 3/8/21 – 5/31/21. For further information, visit bendoregon.gov/desertwoods.
    • East Lake Drive between Twin Lakes Loop and Newberry Drive
    • Twin Lakes Loop Between SE 15th Street and Newberry Drive
  • SE Murphy Road between Country Club and Parrell Road for roadway widening and modernization, full road closure with local access and detours, November 2020 – Summer 2021
  • US HWY 97 between Exit 135A and Exit 139 to Reed Market Road for ODOT overnight resurfacing, southbound lanes with a detour onto US 97 Business Route (3rd Street). 3/15/21 – 5/15/21
  • US HWY 97 between Exit 139 and Exit 141 to Murphy Road for ODOT overnight resurfacing, southbound lanes with a detour onto US 97 Business Route (3rd Street). 3/15/21 – 5/15/21
  • SW Simpson Avenue between SW 15th Street and SW 18th Street for right of way improvements, full road closure with detour, 3/15/21 – 5/1/21
  • Newport Avenue at NW 10th Street for infrastructure installation, Night work with full road closure with detour, 3/21/21 – 4/13/21, 8 PM – 7 AM
  • NW 10th Street at Newport Avenue for infrastructure installation, full road closure, 3/21/21 – 4/13/21

Future Road Closures:

  • NW Nashville Ave between NW Drake Road and NW Newport Ave for infrastructure installation, full road closure, starting 4/5/21

 Work schedules are dependent on weather conditions and other factors. Always exercise increased caution within construction zones.

 

Contact: Kyle Thomas, Construction Manager

541-323-8519, kthomas@bendoregon.gov

 

For Street Preservation related questions: Paul Neiswonger, Streets Supervisor

541-317-3035, pneiswonger@bendoregon.gov

 

Closures and detours in Bend are updated weekly at: bendoregon.gov/traffic

Find more information about street operations at: bendoregon.gov/streetpreservation

Weekly reports can be received via email by subscribing to Weekly Road and Traffic Reports at: bendoregon.gov/enews

 Wheelchair

Accommodation Information for People with Disabilities

To obtain this information in an alternate format such as Braille, large print, electronic formats, etc. please contact Anne Aurand at 541-388-5573 or aaurand@bendoregon.gov.

View All News