Materials and Reports
Email Updates
Email Update – November 2012
Email Update – April 2012
Email Update – March 29, 2012
Email Update – March 2012
Email Update – January 2012
Public Outreach
Public Outreach Summary – May 2012
City Council
Project Briefing Notebook* – December 18, 2012 (37 MB)
*Please Note: The Briefing Notebook is a large document,
therefore it is also available in two parts: Part 1(13MB), Part 2(20MB)
City Letter to State – LT2 Compliance Issues – January 9, 2012
Project Reports and Studies
Assessment of the Surface Water Improvement Project on Tumalo Creek Water Temperatures – Draft Technical Memo – March 13, 2012 (1.3 MB)
Tumalo Creek Instream Flow Study – Draft Technical Memo – March 13, 2012 (3.2 MB)
Tumalo Creek Instream Flow Study Attachment A – Transect Photos – March 13, 2012 (4.4 MB)
Tumalo Creek Instream Flow Study Attachment B – PHABSIM Hydraulic Calibration Report – March 13, 2012 (481 KB)
Tumalo Creek Instream Flow Study Attachment C – Channel Flow-Response Charts – March 13, 2012 (1.7 MB)
Historical Evaluation of the Intake Facility (3 MB)
Timing of Hydro Project – Preliminary Report – February 2012
Value Engineering Study – March 2011 (14.8 MB)
Forest Service Documents
Bridge Creek Pipeline Proposed Special Use Permit: Environmental Assessment and other Forest Service documents
Temporary Road and Trail Closure Map – 2012
FS Trail and Road Closure Press Release – Sept 2012
Decision Notice Special Use Permit: City of Bend Bridge Creek Water Supply System – July 10, 2012
Forest Service Response to Public Comment – July 5, 2012
Errata to Revised Environmental Assessment – July 2012
Revised Environmental Assessment of City of Bend, Bridge Cr. Water Supply System (June 30, 2012 Revised)
City of Bend Memo Re: Public Comment – May 30, 2012
Invitation to Comment through June 6, 2011 – U.S. Forest Service – April 28, 2011 (includes exhibits)
(link to Forest Service Website for more documents)