Bend Bikeway Update

Greetings!

We are sending this update to provide a look at the work that has been completed, is in progress, or is planned for the near future to create the Bend Bikeway’s connected and protected cross‑town routes. We also invite you to join us on a bike ride to learn more about some of the new pilot‑program traffic diverters that were recently installed.

The Bend Bikeway Project helps improve safety and connectivity for people who bike, walk, and roll to employment, schools, businesses, parks, trails, and neighborhood amenities.

Thank you for your interest in this project.

Bend Bikeway’s Reveal Ride

May 5 from 5:00-7:00 p.m.

Join a community bike ride highlighting the Bend Bikeway Project improvements in the Old Bend and River West neighborhoods on Tuesday, May 5. Meet at City Hall (710 NW Wall St.) at 5:00 p.m. to receive Bend Bikeway Project information, route maps, and free bike‑safety gear.

The ride will depart from City Hall at 5:30 p.m. and conclude at 7:00 p.m.

Bend Bikeway’s Reveal Ride Flyer

Project Construction Updates

Neighborhood Greenways

Projects have been completed to build new neighborhood greenways and to improve safety for walking and biking on the City’s system of Neighborhood Greenways. These projects include:

  • Quick-build curb extensions with asphalt art and lighting upgrades are coming this spring. (Example image right)
  • New Neighborhood Greenways on NW Hartford Avenue, NW Harriman Street and on NE Fifth Street, NE Sixth Street and NE Irving Avenue are currently being constructed.

blue and white geometric design pattern painted on asphalt

Bike-activated Rectangular Rapid Flashing Beacons

Bike activated Rectangular Rapid Flashing Beacons that automatically detect bikes to activate flashing lights will be installed at Delaware Avenue & Wall Street and Delaware Avenue & Bond Street this spring.

A pedestrian in a crosswalk...These beacons are installed on crossings where there are two through-lanes in the same directions to mitigate the “double-threat” risk that occurs on multi-lane roads when a driver in one lane stops for a pedestrian, but a driver in an adjacent lane fails to stop.

Median Extension

NE Sixth Street and NE Olney Avenue median extension was completed this winter.

Traffic Diverter Pilot Program

Traffic Diverters have been installed in the Old Bend and River West neighborhoods.

More details and feedback form:
bendoregon.gov/bendbikeway

Shared-Use Paths

Shared use paths adjacent to SE Ninth Street, NE Bear Creek Road, and SE 15th Street are planned for construction this summer.

Protected Bike Lanes

Protected bike lanes along NE Franklin Avenue from NE Fifth Street to NE Eighth Street were completed this winter.

Intersection Improvements

The Butler Market Road and Boyd Acres Road intersection improvements are planned to be constructed with Phase 2 of the Butler Market Key Route Project this fall.

Learn more

Intersection graphic

Wayfinding Signs

Installation of wayfinding signs is underway, beginning at the west end of the Bend Bikeway’s east–west route.

Wayfinding sign

Questions or Comments?

Construction Phone Line: 541-323-0754

Project website: bendoregon.gov/bendbikeway

Project email: bendbikewayteam@bendoregon.gov

Project Contact:

Kevin Howard, Project Manager