Weekly Road Report for the Week of July 27 – August 2

2026 Street Preservation

Various Street improvements within the CIty are continuing this week. Chip seal work will occur, with various rolling lane & street closures during its duration (expect delays). Expected completion July 29.

Work will occur between 7 a.m. – 6 p.m.

Roads affected:

  • July 24, 27, 28: NW Mount Washington Drive between NW Century Drive and Shevlin Park Road
  • July 27: NW Revere Avenue between NW Wall Street and NE 8th Street
  • July 28: NW Crossing Drive between Mt Washington Drive and Skyliners Road
  • July 29: NE Olney Avenue between NW Wall Street and NE Eastwood Drive

More info:

Street Preservation Projects

NW Portland Avenue

NW Portland Avenue between NW 11th Street and NW 12th Street for street paving.

Single lane closures with flagging, July 31 from 8:30 a.m. – 4 p.m.

Highway 20

ODOT Overnight Paving – Paving will occur along Highway 20 between Robal Lane and Mervin Samples Road.

Work occurs late July – early August.

ODOT ADA Ramp Installations – Various ADA ramps along Highway 20 will be replaced during overnight work from 8 p.m. – 6 a.m. with minimal delays.

Work to occur through October 2026.

Intersections affected:

  • Powers Road
  • Butler Market Road
  • Purcell Boulevard
  • 27th Street

Ferguson Road

Ferguson Road between Ferguson Court and Magnolia Lane will have final paving.

Single lane closure with flagging, July 27 – 29 from 9 a.m. – 3:30 p.m.

Parrell Road

Parrell Road between Rae Road and Badger Road for street restriping.

Single lane closures with flagging, July 31 from 8:30 a.m. – 4 p.m.

Brosterhous Road

Brosterhous Road between SE Caldera Drive and the BNSF railroad overcrossing will have a sewer main installation.

Full road closure with detour, July 27 – Early September.

Intersection of SE 15th Street and SE Bronzewood Avenue

Intersection of SE 15th Street and SE Bronzewood Avenue will have utility relocations.

Shoulder and bike lane closures, July 29 – 31 from 9 a.m. – 3:30 p.m.

NW 8th Street

NW 8th Street between NW Portland Avenue and NW Quincy Avenue will have a watermain replacement.

Full road closure with local access only, July 20 – August 31 from 7 a.m. – 3 p.m.

Intersection of NE 11th Street and NE Norton Avenue

The intersection at NE 11th Street and NE Norton Avenue will have roadway and sidewalk infrastructure installations.

Full intersection closure with detour, July 20 – August 25

Cooley Road and Ranch Village Drive

The City of Bend is constructing a new gravity sewer main along Cooley Road and Ranch Village Drive. This new line will connect to existing infrastructure west of the Cooley Road and 18th Street intersection, optimizing our community’s sewer system. Various road impacts will be required for the project including:

  • Cooley Road (Ranch Village Drive to the 18th Street/Cooley Road roundabout) One lane will be closed, with two‑way traffic maintained through flagging.
    Schedule: July 13 – Fall 2026
  • Ranch Village Drive (Double Peaks Drive to Cooley Road) Closed to through traffic; local access only.
    Schedule: Early August – End of October
  • Egypt Drive (Ranch Village Drive to 18th Street) Closed to through traffic; local access only.
    Schedule: Estimated for the last week of August

Franklin Avenue Improvements Project

This initial work is focused on replacing aging water pipes from 1st Street to 4th Street, begins July 6th. Street impacts:

  • Daytime work with lane reductions and flagging required to maintain traffic through the corridor, alternate routes should be taken to avoid delays
  • Temporary westbound closure of Franklin Avenue between 3rd Street and 4th Street begins July 6th and tentatively ends mid-August, detour provided

Franklin Avenue Improvements Project

NE 2nd Street

Water Main Replacement Project – Aging water main will be repaired and replaced along NE 2nd Street.

Phase 1 Work begins July 6 – End of August. Street affected:

  • Ongoing – Phase 1: 2nd Street to be closed from Olney Avenue to Norton Avenue with local traffic allowed through
  • Future – Phase 2: Traffic control anticipated to shift into Phase 2 (2nd Street from Norton Avenue to Lafayette Avenue) on July 29
  • Phase 1 will still have restricted access with current work area acting as a staging area
  • 2nd Street to be closed to through traffic from NE Olney Avenue to NE Lafayette Avenue beginning July 27, with single lane guided access to local traffic through construction extents.
  • Beginning Monday, August 3, a temporary westbound lane closure of Franklin Avenue from NE Second Street to NE Third Street will be required for one month. The detour route includes NE Third Street, Greenwood Avenue, and NW Wall Street

Intersection of SE 15th Street and Ferguson Road

Intersection of SE 15th Street and Ferguson Road will have roundabout construction.

Full intersection closure with detour, June 22 – Fall 2026

Bend Bikeway Project, SE Area

The Bend Bikeway Project provides safer connections for pedestrians and bicycles traveling between neighborhoods, schools, places of work, parks and trails across town. Improvements will include a new shared use path with work primarily occurring as shoulder work, with intermittent single lane closures and flagging.

Work begins June 24 – Fall 2026. Streets affected:

  • SE 9th Street between SE WIlson Avenue and SE Reed Market Road
  • SE 15th Street between the Larkspur park and Bronzewood Ave
  • NE Bear Creek Road between NE Alpenview Lane and SE Craven Road

Bend Bikeway Project

NE 18th Street

NE 18th Street at the intersection with the Yeoman Road extension will have roadway and pedestrian improvements.

Northbound Lane closure with detour (southbound accessible), June 15 – July 30

NW Crossing Farmers Market (Special Event)

Special event occurring every Saturday, May 30 – September 26. Multiple road closures related to event:

  • NW Crossing Drive between Mount Washington Drive and NW Crossing Drive (Circle)
  • NW John Freemont Street between NW Ordiway Avenue and NW Fort Clatsop Street
  • NW Fort Clatsop Street between NW Ordway Avenue and NW John Freemont Street

Windsor Drive

Windsor Drive between Brosterhous Road and Woodside Court for a sewer main installation (part of City Septic to Sewer Program).

Full road closure with local access only, April 27 – End of August

King Hezekiah and Fargo Sewer Project

Various Road closures will be required for the installation of new sewer mains. Road closures listed below:

  • SE King Hezekiah Way between SE 15th Street and King Jehu, June 15 – End of October

King Hezekiah and Fargo Sewer Project

Ponderosa Street

Ponderosa Street between SW Atwood Ave and Granite Drive will have roadway construction.

Full road closure with detour, June 5 – July 28

Magnolia Lane

Magnolia Lane between Hearthstone Lane and Ferguson Road will have infrastructure improvements.

Full road closure with local access only until August 15

Butler Market Corridor Improvements

This project will construct a new single lane roundabout at the intersection of Butler Market and Wells Acres Road, and pedestrian and bicycle improvements on Butler Market between the 8th Street roundabout to Brinson Blvd.

Roadway impacts:

  • Butler Market Road between NE Brinson Boulevard and Broken Bow will have a westbound lane closure with detour.

Construction is well underway and is expected to be completed in September of 2026.

Butler Market Corridor Improvements Project

NW Harriman Street

NW Harriman Street between NW Kearney Avenue and NW Greenwood Avenue for infrastructure work associated with the Deschutes County Courthouse.

Full road closure through July 31


Upcoming Roadway Impacts:

NW 14th Street

NW 14th Street between NW Newport Avenue and NW Ogden Avenue for water service installations.

Daytime full road closure with detour, August 3 – 7.


Work schedules are dependent on weather conditions and other factors. Always exercise increased caution within construction zones. Drivers should use designated detour routes. Nearby residential streets are for local traffic only.

Any road closure not listed within this report, please submit a service request to notify the City of any potentially unpermitted work within City right-of-way. Please visit the Transportation and Mobility Department to submit:

Transportation & Mobility Department

Contact Information

Alex Pelayo, Project Engineer
541-323-8556, apelayo@bendoregon.gov

For Street Preservation related questions:
Paul Neiswonger, Streets Supervisor
541-317-3035, pneiswonger@bendoregon.gov

View All News