Weekly Road Report for the Week of August 17 – 23
NW Portland Avenue
NW Portland Avenue between NW 10th Avenue and NW 11th Street for power pole replacement.
Single land closure with flagging (west-bound lane), August 19 from 8:30 a.m. – 4:00 p.m.
SW Columbia Street and SW Bond Street
Intersection of SW Columbia Street and SW Bond Street for franchise utility relocations.
Right turn lane closure from Columbia Street to Bond Street, August 17 – 21 from 9:00 a.m. – 3:30 p.m.
NW Division Street
NE Division Street between NE Revere Avenue and NW Vail Avenue will have franchise utility aerial installations.
Single land closure with flagging, August 17 – 21 from 9:00 a.m. – 3:30 p.m.
Bridge Inspections
NW Greenwood Avenue between NE 1st street and NW Hill Street.
Single land closure with flagging, August 18 from 7:00 p.m. – 12:00 a.m.
NW Franklin Avenue between NE 1st street and NW Hill Street.
Single land closure with flagging, August 19 from 12:00 – 3:00 a.m.
SE 3rd Street between NE Burnside Avenue and SE Davis Avenue.
Single land closure with flagging, August 19 from 7:00 p.m. – 9:00 p.m.
Sparrow Bakery 20th Anniversary (Special Event)
NW Fort Clatsop Street between NW Crossing Drive and NW Ordway Avenue.
Road closure, August 18 from 3:00 – 9:00 p.m.
SE 5th Street
SE 5th street between SE Roosevelt Avenue and SE Cleveland Avenue for street paving.
Daytime road closure with local access only, August 17 – 21 from 7:00 a.m. – 4:00 p.m.
Highway 20
ODOT Overnight Paving – Paving will occur along Highway 20 between Robal Lane and Mervin Samples Road.
Work occurs through mid August.
ODOT ADA Ramp Installations – Various ADA ramps along Highway 20 will be replaced during overnight work from 8:00 p.m. – 6:00 a.m. with minimal delays.
Work to occur through October 2026.
Intersections affected:
- Powers Road
- Butler Market Road
- Purcell Boulevard
- 27th Street
Brosterhous Road
Brosterhous Road between SE Caldera Drive and the BNSF railroad overcrossing will have a sewer main installation.
Full road closure with detour, July 27 – early September.
NW 8th Street
NW 8th Street between NW Portland Avenue and NW Quincy Avenue will have a watermain replacement.
Full road closure with local access only, July 20 – August 31 from 7:00 a.m. – 3:00 p.m.
Intersection of NE 11th Street and NE Norton Avenue
The intersection at NE 11th Street and NE Norton Avenue will have roadway and sidewalk infrastructure installations.
Full intersection closure with detour, July 20 – August 25
Cooley Road and Ranch Village Drive
The City of Bend is constructing a new gravity sewer main along Cooley Road and Ranch Village Drive. This new line will connect to existing infrastructure west of the Cooley Road and 18th Street intersection, optimizing our community’s sewer system. Various road impacts will be required for the project including:
- Cooley Road (Ranch Village Drive to the 18th Street/Cooley Road roundabout) One lane will be closed, with two‑way traffic maintained through flagging.
Schedule: July 13 – Fall 2026 - Ranch Village Drive (Double Peaks Drive to Cooley Road) Closed to through traffic; local access only.
Schedule: Early August – End of October - Egypt Drive (Ranch Village Drive to 18th Street) Closed to through traffic; local access only.
Schedule: Estimated for the last week of August
Franklin Avenue Improvements Project
This initial work is focused on replacing aging water pipes from 1st Street to 4th Street. Street impacts:
- Daytime work with lane reductions and flagging required to maintain traffic through the corridor, alternate routes should be taken to avoid delays.
- Beginning August 3, Westbound Franklin Avenue between 2nd Street and 3rd Street will be closed with a detour provided for approximately 1 month.
- Westbound closure of Franklin Avenue between 3rd Street and 4th Street has been reopened.
- Beginning August 17, Eastbound Franklin Ave between 3rd Street and 4th Street will be closed.
Franklin Avenue Improvements Project
NE 2nd Street
Water Main Replacement Project – Aging water main will be repaired and replaced along NE 2nd Street.
Phase 1 Work begins July 6 – End of August. Street affected:
- Ongoing – Phase 1: 2nd Street to be closed from Olney Avenue to Norton Avenue with local traffic allowed through.
- Phase 2: 2nd Street from Norton Avenue to Lafayette Avenue began work on July 29.
- Phase 1 will still have restricted access with current work area acting as a staging area.
- 2nd Street to be closed to through traffic from NE Olney Avenue to NE Lafayette Avenue, with single lane guided access to local traffic through construction extents.
Intersection of SE 15th Street and Ferguson Road
Intersection of SE 15th Street and Ferguson Road will have roundabout construction.
Full intersection closure with detour, June 22 – Fall 2026
Bend Bikeway Project, SE Area
The Bend Bikeway Project provides safer connections for pedestrians and bicycles traveling between neighborhoods, schools, places of work, parks and trails across town. Improvements will include a new shared use path with work primarily occurring as shoulder work, with intermittent single lane closures and flagging.
Work begins June 24 – Fall 2026. Streets affected:
- SE 9th Street between SE WIlson Avenue and SE Reed Market Road.
- SE 15th Street between the Larkspur park and Bronzewood Ave.
- NE Bear Creek Road between NE Alpenview Lane and SE Craven Road.
NW Crossing Farmers Market (Special Event)
Special event occurring every Saturday, May 30 – September 26. Multiple road closures related to event:
- NW Crossing Drive between Mount Washington Drive and NW Crossing Drive (Circle)
- NW John Freemont Street between NW Ordiway Avenue and NW Fort Clatsop Street
- NW Fort Clatsop Street between NW Ordway Avenue and NW John Freemont Street
Windsor Drive
Windsor Drive between Brosterhous Road and Woodside Court for a sewer main installation (part of City Septic to Sewer Program).
Full road closure with local access only, April 27 – End of August
King Hezekiah and Fargo Sewer Project
Various Road closures will be required for the installation of new sewer mains. Road closures listed below:
- SE King Hezekiah Way between SE 15th Street and King Jehu, June 15 – End of October
King Hezekiah and Fargo Sewer Project
Magnolia Lane
Magnolia Lane between Hearthstone Lane and Ferguson Road will have infrastructure improvements.
Full road closure with local access only until August 28
Butler Market Corridor Improvements
This project will construct a new single lane roundabout at the intersection of Butler Market and Wells Acres Road, and pedestrian and bicycle improvements on Butler Market between the 8th Street roundabout to Brinson Blvd.
Roadway impacts:
- Butler Market Road between NE Brinson Boulevard and Broken Bow will have a westbound lane closure with detour.
- Overnight closure of Butler Market Road between NE 8th Street and NE Brinson Boulevard will be occurring August 17 from 7:00 p.m. – 7:00 a.m. for roundabout paving work
Construction is well underway and is expected to be completed in September of 2026.
Butler Market Corridor Improvements Project
2026 Street Preservation
Chip seal work within the City is finalized with final striping occurring this week by City Crews. No lanes will be closed but expect delays on the following streets while striping occurs.
Work will occur between 7:00 a.m. – 6:00 p.m.
Roads affected:
- SW Mount Washington Drive
- Northwest Crossing Drive
- NE Neff Road
- NE Olney Avenue
- NE Purcell Boulevard
- NE Revere Avenue
Upcoming Roadway Impacts:
Bend Beer Run (Special Event)
Event taking place August 29, between 12 p.m. – 2 p.m.
The course of the run will occur along various City streets with a few temporary stops with flaggers. Expect delays:
- Galveston Avenue near Drake Park
- Intersection of Shevlin Hixon and SW Allen Road
NE Revere Avenue
NE Revere Avenue between NE 4th Street and NE 8th Street will have franchise utility aerial installations.
Lane shifts and single lane closures with flagging, August 24 – 28 from 9:00 a.m. – 3:30 p.m.
Work schedules are dependent on weather conditions and other factors. Always exercise increased caution within construction zones. Drivers should use designated detour routes. Nearby residential streets are for local traffic only.
Any road closure not listed within this report, please submit a service request to notify the City of any potentially unpermitted work within City right-of-way. Please visit the Transportation and Mobility Department to submit:
Transportation & Mobility Department
Contact Information
Alex Pelayo, Project Engineer
541-323-8556, apelayo@bendoregon.gov
For Street Preservation related questions:
Paul Neiswonger, Streets Supervisor
541-317-3035, pneiswonger@bendoregon.gov
Closures and detours in Bend are updated weekly:
View All News