Actualización sobre las obras de la tubería de agua de Awbrey Butte – 29 de septiembre de 2023
LA SEGURIDAD ES LO PRIMERO
Conduzca con precaución por la zona de obras. Preste atención a las actividades de construcción, incluidas las excavaciones a cielo abierto. Las zanjas abiertas se vallan al final de cada jornada.
ACTUALIZACIÓN SOBRE LAS OBRAS

Week of Octubre 2 construction activities:
- Patching of service line trenches will take place along Awbrey Road between Utica Avenue and Wilmington Avenue.
- Grinding of the road will take place on Awbrey Road, Vicksburg Avenue, and Utica Avenue in preparation for paving.
- Following grinding, full-width paving will take place on Awbrey Road (Portland to Saginaw & Utica to Wilmington), Vicksburg Avenue, and Utica Avenue. Parking along these streets will be restricted during this week (notifications with parking restriction details are being distributed). Drivers should expect delays for access while this work is taking place.
- The last of the water meter boxes along Awbrey Road will be set and backfilled.
Week of Octubre 9 construction activities:
- Minor landscape restoration and clean up.
- Crews will install a concrete valley gutter at the Utica Avenue and Awbrey Road intersection to assist with drainage.
- Final striping will take place along Awbrey Road.
Traffic Control for Octubre 2 to Octubre 13:
- There will be a single lane closure regulated by flaggers along Awbrey Road from Portland to Saginaw and Utica to Wilmington. There will be no parking along either of these segments all week. Delays are expected.
- Vicksburg Avenue and Utica Avenue will both be local access only. Parking will be restricted from Lunes evening (10/2) to Miércoles evening (10/4). Delays are expected.

DESVÍOS EN VIGOR
- A portion of the streets mentioned above may be closed for excavation and water main construction activities. Please follow the necessary road closed and detour signs and reference the online detour map below for additional information.
- Habrá señalizadores presentes durante las obras, según sea necesario.
An interactive map of closures and detours can be found at bendoregon.gov/traffic
Notas generales del proyecto
- Se mantendrá el acceso a todas las calles y entradas locales, aunque se producirán ligeros retrasos.
- Durante las obras se mantendrá el acceso para los vehículos de emergencia.
¿TIENES ALGUNA PREGUNTA O COMENTARIO?
- Teléfono del proyecto: 541-382-3264
- Correo electrónico del proyecto: awbreywaterline@bendoregon.gov
- Sitio web del proyecto: www.bendoregon.gov/awbrey-waterline
- Personas de contacto del proyecto:
- Austin Somhegyi, ingeniero de proyectos
- ShanRae Hawkins, coordinadora de participación ciudadana