The concrete that is being poured over the next week has a specific cure time to provide an optimal life expectancy. Pedestrians should follow all designated routes around the newly formed curbs. With the hot weather, the exterior of the concrete may appear dry but could still be curing beneath the surface.
Crews are scheduled to work on Sábado, julio 10, during normal work hours to complete the project as soon as possible.
ACTUALIZACIÓN SOBRE LAS OBRAS


Above: New gutter, curb, and ramps are forming the perimeter of the roundabout.
Obras previstas en la avenida Simpson y la calle Columbia
Week of julio 7 – julio 14
- A curb forming machine is used to form the new concrete curbs and gutters. Crews then shape and finish the ADA ramp and bike ramp access locations.
- Se está construyendo la plataforma para camiones de la rotonda, lo que define la circunferencia interior de la calzada de la rotonda.
- The final utility installation is being completed in preparation for the roundabout concrete surface.
DESVÍOS EN VIGOR
Cortes de carretera actuales
- Cruce de la avenida Simpson con Columbia

NOTAS GENERALES DEL PROYECTO
- Los comercios de la zona siguen abiertos.
- Por favor, no entre en la zona de obras antes, durante ni después del horario de trabajo.
- Hay varias obras en la zona y en toda la ciudad de Bend. Conduzca con precaución.
¿TIENES ALGUNA PREGUNTA O COMENTARIO?
Página web del proyecto:www.bendoregon.gov/columbia-roundabouts
Línea telefónica de obras, disponible las 24 horas: (458) 256-6009
Contactos del proyecto
Deedee Fraley,ingeniera de proyectos sénior del Ayuntamiento de Bend–dfraley@bendoregon.govo (541) 385-6199
Peter Guth,Equipo de Participación Ciudadana del Proyecto–pguth@dowl.como (541) 385-4772
Ver todas las noticias