Olney Pedestrian and Bicycle Improvements Project Update – Mayo 19, 2025
CONSTRUCTION UPDATE: Mayo 19-Mayo 30
Work Area 1: NW Portland Avenue/NE Olney Avenue from the river to NE First Street
NW Portland Avenue and the NW Wall Street/NE Olney Avenue intersection are planned to reopen by Viernes Mayo 23, ahead of Memorial Day weekend. NE Olney Avenue east of NW Wall Street to NE 2nd Street will remain closed through the fall of 2025.
The asphalt paving at the NW Wall Street/NE Olney Avenue intersection to the NW Portland Avenue bridge is complete. The driveway to Pacific Park is paved, as well as the Deschutes River Trail crossing. From Mayo 19-Mayo 22, the striping, signing, illumination, and signal improvements are being completed at the NW Wall Street/NE Olney Avenue intersection.
Work Area 2: NW Wall Street/NE Olney Avenue to NE Second Street/NE Olney Avenue
Crews continue to work on the new sewer line and retaining wall construction.
Construction and preparation for sewer and water line borings under the railroad continues.
Temporary sewer and water bypasses are being utilized to ensure businesses have sewer and water services throughout construction. All temporary water shut offs will be limited and communicated to businesses/residents ahead of time.
ACTUALIZACIONES DE ACCESO
- The NE Olney Avenue/NE Second Street Intersection is open
- The NE Olney Avenue/NE First Street Intersection is closed for sewer improvements. All businesses remain open and can be accessed by driveways on NE First Street and NE Second Street.
- A pedestrian and bicycle temporary access route for the Deschutes Rail Trail crossing is being routed around the project work area.
- For additional vehicle, pedestrian, and bicycle detour information:
- Reference this detour map until Mayo 23, 2025.
- Reference the revised detour map beginning Mayo 23 through fall 2025.
- EMS, autobuses y otros proveedores de servicios de entrega/servicios se han incluido en esta lista de distribución.
NOTAS GENERALES DEL PROYECTO
- Se mantiene el acceso a todos los negocios situados a lo largo de la zona de obras. Todos los negocios están abiertos.
- No entre en la zona de obras cerrada antes, durante ni después del horario laboral. Manténgase alejado de las zonas de obras cerradas y de la maquinaria. Hay zanjas abiertas, maquinaria pesada y otros peligros en toda la zona de obras cerrada.
- El horario laboral diurno es de 7:00 a. m. a 6:00 p. m.
Ruido, vibraciones y polvo durante el horario laboral habitual.
¿PREGUNTAS O COMENTARIOS?
- Línea telefónica de construcción: 541-322-9919
- Project website: www.bendoregon.gov/olneypedbike
- Project e-mail: olneypedbike@bendoregon.gov
- Contactos del proyecto:
- Carrie Harris – Gerente de proyectos
- Madeline Allen-Sandoz – Project Assistant
- Linda Swearingen – Coordinadora de Participación Pública del Proyecto