Actualización del proyecto de la cuenca de alcantarillado SW, fase 2B – 24 de enero de 2022
SAFETY FIRST
Tenga en cuenta las obras y conduzca con precaución por la zona de obras, donde hay zanjas abiertas. Las zanjas abiertas se vallan al final de cada jornada.
ACTUALIZACIÓN SOBRE LAS OBRAS
Week of Enero 24-28 construction activities:
- Crews will continue installing sewer pipe and maintenance holes along McMullin Drive and portions of Ridge Drive. This activity includes road closures and detours.
- Crews will continue excavating for new stormwater dry wells, which will be installed in the right-of-way adjacent to 60944 McMullin Drive, 60945 Ridge Drive, 60964 McMullin Drive, and 19955 Mahogany Street.
DESVÍOS EN VIGOR
- A portion of McMullin Drive and Ridge Drive will be closed for excavation and sewer installation activities. Please reference the detour map below for additional information.
- Flaggers will be present for the pre-hammering activities and pipe installation as needed.
En la página webwww.bendoregon.gov/traffic se puede consultar un mapa interactivo con los cierres y desvíos.
COMUNICACIÓN DEL PROYECTO
Notas generales del proyecto
- Se mantendrá el acceso a todos los comercios situados al final de Romaine Village Way.
- Durante las obras se mantendrá el acceso para emergencias.
¿TIENES ALGUNA PREGUNTA O COMENTARIO?
Página web del proyecto:https://www.bendoregon.gov/swsewerpipe
Persona de contacto del proyecto:
Jake Sherman – City of Bend, Senior Project Engineer – Phone: (541) 383-4882 | Email: jsherman@bendoregon.gov

Above: New pipe installation in Cinder Lane looking west

Above: Excavation in Ridge Drive heading north for new sewer