Weekly Road and Traffic Report for the Week of Abril 10 – 16

For the Week of Abril 10 – 16:

  • OB Riley Road between Roper Lane and Glen Vista Road for infrastructure installation, northbound lane shift with flagging, expect minimal delays in traffic, Abril 11, 2023 – Mayo 12, 2023.
  • Roundabout at intersection of Eighth Street and Butler Market Road for ADA ramp replacement, single lane flagging through roundabout, Abril 12, 2023 – Abril 14, 2023

Ongoing Closures:

  • Neff & Purcell Improvement Project – The Neff Road and Purcell Boulevard Improvements Project is a high priority project providing both north-south connectivity and improving safety and capacity in a vital area of Bend. For more information visit the Neff and Purcell Improvement Project webpage.
    • Intersection of NE Neff Road and NE Purcell Boulevard for infrastructure improvements, full road closure with detour, began Feb. 22, 2023.
  • Wilson Corridor Improvements Project – Street improvements on Wilson Avenue from Second Street to 15th Street. For more information visit the Wilson Project website. This is a multiphase project with various intersections and road closures throughout its entirety.
    • Intersection of 15th Street and Wilson Avenue for roundabout construction, full intersection closure with detour, Febrero – Early Summer 2023.
  • Newport Corridor Improvements Project – Various intersections along Newport Avenue to be closed due to removal and replacement of underground utilities. Road closures related to the project listed below. For more information, visit Newport Corridor Improvements Project webpage. Various closures through Mayo 2023.
    • Full closure of the NW 14th Street roundabout, Jan. 9, 2023 – Mayo 2023
    • NW Newport Avenue east of NW 14th Street through NW Juniper Street, Jan. 9, 2023 – Mayo 2023
    • NW 14th Street Between NW Ogden Avenue and NW Milwaukee Avenue, Jan. 9, 2023 – Mayo 2023
    • NW 15th Street between NW Milwaukee and NW Newport Avenue, Jan. 5, 2023 – Mayo 2023
      • Third and Pinebrook Safety Crossing Project – Safety improvements at the north side of SE Third Street and Pinebrook Boulevard intersection. Median to be constructed with pedestrian crossing. Road and lane closures anticipated on Pinebrook and Third Street with work anticipated to be completed mid-summer 2023. Work begins Abril 3, 2023.
        • Pinebrook boulevard between SE Third Street and commercial entrances closed for construction
      • Third Street lane closures at Pinebrook intersection, expect delays SE Sydney Harbor Court between SE Delta Drive and SE Humber Lane for water infrastructure installation, full road closure with local access, Marzo 23, 2023 – Abril 21, 2023
      • Cooley Road between NW Brownrigg Lane and HWY 20 for initial roundabout construction, full closure with detour, begins Feb. 20, 2023.
      • ODOT Third Street Improvements – Infrastructure improvements along Third Street from Butler Market Road to Greenwood Avenue. Various types of traffic control will be implemented during construction. Expected to be completed at the end of summer 2023. Street sections affected listed below.
        • Single-lane closures on Third Street near Mervin Sampels Road intersection
      • Ferguson Sewer Project – This project is decommissioning the Camden and Ridgewater No. II Pump Stations and installing gravity sewer on Ferguson Road. Project completion fall 2023.
        • Ferguson Road between King Solomon Lane and Sage Creek Drive for the Freguson Sewer Project, Eastbound Lane closure with detour, begins Jan. 3, 2023.

      Cierres de carreteras previstos:

      • 2023 Salmon Run – This special event includes a 5K, 10K, and half marathon. The event will primarily use City sidewalks and BPRD trails, crossing a few higher-classification streets with the use of certified flaggers (streets listed below). Event to take place Abril 21, 2023.
        • NW Galveston Avenue between NW Harmon Boulevard and NW Riverfront Street
      • Bend Marathon – Downtown Bend and various City streets

      Los horarios de trabajo dependen de las condiciones meteorológicas y otros factores. Extreme siempre las precauciones en las zonas de obras. Los conductores deben utilizar las rutas de desvío designadas. Las calles residenciales cercanas son solo para tráfico local.


      Contacto:

      Deedee Fraley, Assistant City Engineer

      541-385-6199, dfraley@bendoregon.gov

      Para preguntas relacionadas con la conservación de las calles:

      Paul Neiswonger, Streets Supervisor

      541-317-3035, pneiswonger@bendoregon.gov


      Los cierres y desvíos en Bend se actualizan semanalmente en: bendoregon.gov/traffic

      Encuentre más información sobre las operaciones en las calles en: bendoregon.gov/streetpreservation

      Los informes semanales se pueden recibir por correo electrónico suscribiéndose a los Informes semanales sobre carreteras y tráfico en: bendoregon.gov/enews


      Información sobre alojamiento para personas con discapacidad

      Silla de ruedas

      To obtain this information in an alternate format such as Braille, large print, electronic formats, etc. please contact Anne Aurand at 541-388-5573 or aaurand@bendoregon.gov.

      Ver todas las noticias