For the Week of julio 12 – 18:
- Intersection of SE 15th Street and SE Caldera Drive for roundabout construction, full intersection closure with detour (Shoefly Road constructed), 7/14/21 – 9/10/21
- Reed Market Road Bridge over Deschutes River closed between Mt. Bachelor Way and Alderwood Circle for bridge resurfacing, detour onto Colorado Avenue, 7/12/21 – 7/23/21 (Mon – Fri), 5 a.m. – 5 p.m
- NE Burnside Avenue between NE 3rd Street and NE 4th Street for infrastructure improvements, full road closure with detour, 7/6/21 – 7/16/21
- NE Wells Acres Road (from NE 27th Street to NE Weeping Willow Drive) – Underground electrical conduit construction. Daytime lane closures and flagging. Side street work also expected on NE Weeping Willow Drive and NE Brian Ray Ct. Temporary on-street parking restrictions in neighborhood. 6/28 to 7/30. For further information, visit bendoregon.gov/streetsafety
- NW Sisemore Street (from NW Colorado to NW Florida Avenue) – Sidewalk, driveway and alley construction on the east side of the street only. Shoulder and alley closures. Temporary on-street parking restrictions. 6/28 – 7/23. For further information, visit bendoregon.gov/streetsafety
- 2021 Bend Criterion Series – special event occurring every Miércoles 7/7/21 – 7/28/21, 3 p.m. – 8 p.m. Multiple Road closures related to event (listed below).
- NW Crosby Drive between NW Skyline Ranch Rd
- NW Elwood Lane between NW Crosby Drive and NW Lolo Drive
- NW Lolo Drive between NW Elwood Lane and NW Skyline Ranch Road
- NW Skyline Ranch Road between NW Lolo Drive and NW Crosby Drive
- NW Crossing Farmers Market – special event occurring every Sábado 6/5/21 – 10/16/21. Multiple road closures related to event (listed below).
- NW Crossing Drive between Mount Washington Drive and NW Crossing Drive (Circle)
- NW John Freemont between NW Ordiway Avenue and NW Fort Clatsop Street
- NW Fort Clatsop Street between NW Ordway Avenue and NW John Freemont Street
- NE 8th Street between NE Marlon Place and NE Bennington Way for infrastructure installation, single lane closure with minimal impacts, begins 5/24/21
- SW Simpson – Columbia intersection – Closed for roundabout construction beginning Mayo 17th – Agosto. Full closure of intersection with detour. For further information, visit bendoregon.gov/Columbia-roundabouts.
- NE Butler Market – Purcell Intersection – closed for roundabout construction beginning Mayo 3rd – mid Septiembre. This is part of the Empire Corridor Improvements Project. For further information, visit bendoregon.gov/empire.
- NW Skyline Ranch Road between NW Chianti Lane and NW Shevlin Meadow Drive for infrastructure installation, full road closure, 4/12/21 – 7/30/21
- Via Sandia Neighborhood Extension Project – Roads closed for sewer main installation with local access, 5/17/21 – 8/30/21. For further information, visit bendoregon.gov/city-projects/infrastructure-projects/septic-to-sewer-conversion-program/via-sandia-east-lake-drive-orion-drive-sewer-project
- East Lake Drive between Twin Lakes Loop and Newberry Drive
- Twin Lakes Loop Between SE 15th Street and Newberry Drive
- Via Sandia between Sky Harbor Drive and Cabin Court
- Cabin Court between Via Sandia
- Newport Corridor Improvements Project – Various intersections along Newport Avenue to be closed due to updates in the water main and stormwater facilities. Road closures related to the project listed below.
- NW Nashville Ave between NW Drake Road and NW Newport Ave for infrastructure installation, full road closure, starting 4/5/21
- Intersection of 9th Street and Newport Avenue for infrastructure installation, full roundabout closure with detour, starting 4/5/21
Cierres de carreteras previstos:
- Newport Avenue Bridge over Deschutes River closed between NW Brooks Street and NW Awbrey Road for bridge resurfacing, detour to Portland Avenue, 7/26/21 – 7/30/21
Los horarios de trabajo dependen de las condiciones meteorológicas y otros factores. Extreme siempre las precauciones en las zonas de obras. Los conductores deben utilizar las rutas de desvío designadas. Las calles residenciales cercanas son solo para tráfico local.
Contact: Kyle Thomas, Construction Manager
541-323-8519, kthomas@bendoregon.gov
For Street Preservation related questions: Paul Neiswonger, Streets Supervisor
541-317-3035, pneiswonger@bendoregon.gov
Los cierres y desvíos en Bend se actualizan semanalmente en: bendoregon.gov/traffic
Encuentre más información sobre las operaciones en las calles en: bendoregon.gov/streetpreservation
Los informes semanales se pueden recibir por correo electrónico suscribiéndose a los Informes semanales sobre carreteras y tráfico en: bendoregon.gov/enews

Información sobre alojamiento para personas con discapacidad
To obtain this information in an alternate format such as Braille, large print, electronic formats, etc. please contact Anne Aurand at 541-388-5573 or aaurand@bendoregon.gov.
Ver todas las noticias