Informe semanal sobre carreteras y tráfico para la semana del 14 al 20 de julio
For the Week of julio 14-20:
- SW Century Drive/SW Simpson Avenue roundabout – julio 15 – julio 18 there will be 4-way flagging set up at the roundabout. There will also be a flagger stationed adjacent to the roundabout for the south side of SW Simpson Avenue (east bound traffic) prior to Powder House. 9:00 a.m. – 3:30 p.m.
- Intersection of Cooley Road and NE 18th Street for infrastructure installations and removals, single lane closure within the roundabout, julio 8 – 17.
- Hawthorne Avenue between NW Hill Street and NW Harriman Street for a watermain replacement project, full road closure with local access only, julio 14 – Agosto 15, 6:30 a.m. – 4:00 p.m.
- Magnolia Lane between Ferguson Road and Hearthstone Lane for roadway improvements, southbound lane closure with detour, julio 15 – 18, 7:00 a.m. – 5:00 p.m.
- NW Costco Drive between NW Henry Avenue and Robal Lane for infrastructure work related to the Goodwill site, full road closure with local access only, julio 15 – 29, 7:00 a.m. – 5:00 p.m.
- SW Industrial Way between SW Bond Street and SW Division Street for street improvements, full road closure with detour, julio 9 – Agosto 22.
- NW 14th Street between NW Newport Avenue and NW Galveston Avenue for aerial utilities work, brief flagging during aerial crossings only, julio 7 – 18, 9:00 a.m. – 3:30 p.m.
- 2025 Street Preservation – Street preservation continues with street resurfacing (grind & inlay). Various Streets will have this work occurring with various lane & street closures during its duration (expect delays). Work is to occur junio 30 – Agosto 3. Roads affected are listed below with anticipated dates of work. Work will occur during both daytime and nighttime hours. Daytime work hours are from 7:00 a.m. – 6:00 p.m. and Nighttime hours are from 7:00 p.m. – 6:00 a.m.. Learn more at the Street Preservation webpage.
- NE 8th Street between Highway 20 and NE Butler Market Road, julio 8 – 16 (nighttime work)
- Jamison Street north of Empire Avenue, julio 14 – 20 (nighttime work)
- Poe Sholes Drive between Jamison Street and Britta Street, julio 15 & 21 (nighttime work)
- Hunnel Road between Robal Lane and Cooley Road, julio 15 – 16 & julio 22 – 23 (nighttime work)
- Knott Road between SE 15th Street and Raintree Court for road work, road closed to eastbound traffic with a detour in place, junio 30 – Agosto 25.
- Criterion Race Series (special event) – This special event is a five-week race event occurring every Miércoles from junio 25 – julio 23. The event will close a few NW City streets (listed below). A detour will be in place for the event.
- NW Sacagawea Lane between NW John Freemont Street and NW Meriwether Place.
- NW John Freemont Street between NW Sacagawea Lane and NW High Lakes Loop.
- NW High Lakes Loop between NW John Freemont Street and NW Meriwether Place.
- NW Meriwether Place between NW Sacagawea Lane and NW High Lakes Loop.
- Granite Drive between Poplar Street and Ponderosa Street, road closed with detour route, junio 24 – Agosto 8.
- Staats Waterline Project– Replacement of aging water lines, upgraded hydrants and stormwater infrastructure, and pavement restoration along its entirety. Daytime closures of the roadway will occur during daytime hours (7:00 a.m. – 6:30 p.m.), junio 9 – End of Agosto. Street closures listed below.
- NW Staats Street between NW Georgia Avenue and NW Kansas Avenue.
- NW Kansas Avenue between NW Bond Street and NW Lava Road.
- Boyd Acres Road between Brinson Boulevard and Builders Street will have frontage improvements for a private development, lane closure with lane shift, junio 9 – julio 31.
- Proyecto de mejoras en Bear Creek y la calle 27 – Este proyecto tiene como objetivo mejorar la seguridad y la conectividad mediante la creación de rutas más seguras para ciclistas y peatones y la construcción de una rotonda en una intersección con alto índice de accidentes. Las obras comenzaron el 2 de junio y finalizarán en otoño de 2025.
- Roundabout construction at the intersection of NE Bear Creek and NE Purcell Boulevard will begin the work, full closure with detour during its duration.
- NW Crossing Farmers Market (special event) – special event occurring every Sábado Mayo 31 – Octubre 11. Multiple road closures related to event (listed below).
- NW Crossing Drive between Mount Washington Drive and NW Crossing Drive (Circle).
- NW John Freemont between NW Ordiway Avenue and NW Fort Clatsop Street.
- NW Fort Clatsop Street between NW Ordway Avenue and NW John Freemont Street.
- Mejoras para peatones y ciclistas en Olney – Este proyecto instalará infraestructura actualizada para bicicletas y peatones a lo largo de Olney Avenue y Portland Avenue, entre el puente de Portland Avenue y Second Street. También se instalarán alcantarillado y tuberías principales de agua nuevas. Las obras comenzaron el 3 de febrero y finalizarán en otoño de 2025. Para obtener más información, visite el sitio web Sitio web del Proyecto de Mejoras para Peatones y Bicicletas de OlneySe producirá un cierre total de la intersección (con desvío) para comenzar el proyecto con los tramos de calle cerrados que se enumeran a continuación.
- The intersection of NW Wall Street and NE Olney Avenue is now open to traffic.
- Olney Avenue (al este de NW Wall Street hasta NE Second Street) permanecerá cerrada hasta el otoño de 2025.
- Parkwood Court, Westview East and Newberry and Twin Lakes Sewer Project – the City of Bend Programa de conversión de fosas sépticas a alcantarillado will install public pressure and gravity sewer in these neighborhoods. Road closures began in junio:
- SE Westview Drive – road closed (local traffic only) between SE Admiral Way and SE Hill Ridge Road – junio 16th through Agosto 1st.
- Twin Lakes Loop – road closed (local traffic only) from East Lake Drive to Newberry Drive – junio 19th to Septiembre 19th.
- Newberry Drive – road closed (local traffic only) from Twin Lakes Loop to East Lake Drive – junio 19th to Septiembre 19th.
- La calle NW Harriman Street, entre NW Kearney Avenue y NW Greenwood Avenue, permanecerá cerrada al tráfico por obras de infraestructura relacionadas con el juzgado del condado de Deschutes desde el 24 de julio de 2024.
- Intersection of Deschutes Market Road and NE Yeoman Road for roundabout construction, full road closure with detour, Abril 14th – julio 2025.
- Intersection of NW Skyline Ranch Road and Skyliners Road for roundabout construction, full road closure with detour, junio 16 – Septiembre 2.
Los horarios de trabajo dependen de las condiciones meteorológicas y otros factores. Extreme siempre las precauciones en las zonas de obras. Los conductores deben utilizar las rutas de desvío designadas. Las calles residenciales cercanas son solo para tráfico local.
Si hay algún cierre de carretera que no figure en este informe, envíe una solicitud de servicio para notificar al ayuntamiento cualquier obra potencialmente no autorizada dentro del derecho de paso de la ciudad. Visite el Departamento de Transporte y Movilidad para enviarla.
Contacto:
Alex Pelayo, ingeniero de proyectos
541-323-8556, apelayo@bendoregon.gov
Para preguntas relacionadas con la conservación de las calles:
Paul Neiswonger, supervisor de calles
541-317-3035, pneiswonger@bendoregon.gov
Los cierres y desvíos en Bend se actualizan semanalmente en: bendoregon.gov/traffic
Encuentre más información sobre las operaciones en las calles en: bendoregon.gov/streetpreservation
Los informes semanales se pueden recibir por correo electrónico suscribiéndose a los Informes semanales sobre carreteras y tráfico en: bendoregon.gov/enews
Información sobre alojamiento para personas con discapacidad
Para obtener esta información en un formato alternativo, como braille, letra grande, formatos electrónicos, etc., póngase en contacto con Jacob Larsen en el 541-647-0696 o en jlarsen@bendoregon.gov.
Ver todas las noticias