We’re now in the middle of construction season! As you navigate your way through the City streets and neighborhoods, please remember to slow down, read the signs and stay on the designated detour routes. Check in weekly with the City on upcoming closures through the website: bendoregon.gov/traffic. Construction season will not last forever, please be patient and remember to drive like you’re in your own neighborhood.

  • Empire Avenue between Jamison Street and Britta Street for ODOT frontage improvements, single lane closure with lane shift, minimal impacts to traffic, 6/14/21 – 6/30/21
  • NW Crossing Farmers Market – special event occurring every Sábado 6/5/21 – 10/16/21. Multiple road closures related to event (listed below).
    • NW Crossing Drive between Mount Washington Drive and NW Crossing Drive (Circle)
    • NW John Freemont between NW Ordiway Avenue and NW Fort Clatsop Street
    • NW Fort Clatsop Street between NW Ordway Avenue and NW John Freemont Street
  • SW Sisemore Street between Cleveland Avenue and McKinley Avenue for water main & service replacements, Full Road closure with local access, 6/7/21 – 6/18/21
  • NE 8th Street between NE Marlon Place and NE Bennington Way for infrastructure installation, single lane closure with minimal impacts, begins 5/24/21
  • Brookswood Blvd. and Hollygrape Street – safety island, curb ramp, and crosswalk construction – Lane shifts and turn lane closures on Brookswood, 5/24/21 – 6/28/21. For further information, visit bendoregon.gov/streetsafety
  • SW Simpson – Columbia intersection – Closed for Roundabout construction beginning Mayo 17th – Agosto. Full closure of intersection with detour. For further information, visit bendoregon.gov/Columbia-roundabouts.
  • NE Butler Market – Purcell Intersection – closed for roundabout construction beginning Mayo 3rd – mid Septiembre. This is part of the Empire Corridor Improvements Project. For further information, visit bendoregon.gov/empire.
  • NW Skyline Ranch Road between NW Chianti Lane and NW Shevlin Meadow Drive for infrastructure installation, full road closure, begins 4/12/2021
  • SW Simpson Avenue between SW 15th Street and SW 18th Street for right of way improvements, full road closure with detour, 3/15/21 – 6/18/21
  • Newport Corridor Improvements Project – Various intersections along Newport Avenue to be closed due to updates in the water main and stormwater facilities. Road closures related to the project listed below.
    • NW Nashville Ave between NW Drake Road and NW Newport Ave for infrastructure installation, full road closure, starting 4/5/21
    • Intersection of 9th Street and Newport Avenue for infrastructure installation, full roundabout closure with detour, starting 4/5/21

Los horarios de trabajo dependen de las condiciones meteorológicas y otros factores. Extreme siempre las precauciones en las zonas de obras. Los conductores deben utilizar las rutas de desvío designadas. Las calles residenciales cercanas son solo para tráfico local.

 

Contact: Kyle Thomas, Construction Manager

541-323-8519, kthomas@bendoregon.gov

 

For Street Preservation related questions: Paul Neiswonger, Streets Supervisor

541-317-3035, pneiswonger@bendoregon.gov

 

Los cierres y desvíos en Bend se actualizan semanalmente en: bendoregon.gov/traffic

Encuentre más información sobre las operaciones en las calles en: bendoregon.gov/streetpreservation

Los informes semanales se pueden recibir por correo electrónico suscribiéndose a los Informes semanales sobre carreteras y tráfico en: bendoregon.gov/enews

Silla de ruedas

Información sobre alojamiento para personas con discapacidad

To obtain this information in an alternate format such as Braille, large print, electronic formats, etc. please contact Anne Aurand at 541-388-5573 or aaurand@bendoregon.gov.

Ver todas las noticias