Weekly Road and Traffic Report for the Week of Marzo 22-28

For the Week of Marzo 22-28:

  • NW Shevlin Park Road between NW Shevlin Bluffs Drive and NW Skyline Ranch Drive for infrastructure installation, lane shift into median with minimal disruption to traffic, 3/23/21 – 3/24/21, 9 a.m. – 3 p.m.
  • NW York Drive between NW Clearwater Drive and NW Charbonneau Street for waterline removal and installation, full road closure with local access, 3/22/21 – 4/2/21McClain Drive between NW Shevlin Park Road and NW Shevlin Meadow Drive for infrastructure installation, work began 11/30/20
  • SW Colorado – Columbia intersection – Closed for Roundabout construction beginning Marzo 1st – mid-Mayo. For further information, visit bendoregon.gov/Columbia-roundabouts.
  • Colorado Avenue between SW Emkay Drive (west) and SW Emkay (east)
  • SW Columbia Avenue closed between SW Emkay Drive and SW Disk Drive
  • Desert Woods Neighborhood Extension Project – Roads closed for Sewer main installation with local access, 3/8/21 – 5/31/21. For further information, visit bendoregon.gov/desertwoods.
  • East Lake Drive between Twin Lakes Loop and Newberry Drive
  • Twin Lakes Loop Between SE 15th Street and Newberry Drive
  • SE Murphy Road between Country Club and Parrell Road for roadway widening and modernization, full road closure with local access and detours, noviembre 2020 – Summer 2021
  • US HWY 97 between Exit 135A and Exit 139 to Reed Market Road for ODOT overnight resurfacing, southbound lanes with detour onto US 97 Business Route (3rd Street). 3/15/21 – 5/15/21
  • US HWY 97 between Exit 139 and Exit 141 to Murphy Road for ODOT overnight resurfacing, southbound lanes with detour onto US 97 Business Route (3rd Street). 3/15/21 – 5/15/21
  • SW Simpson Avenue between SW 15th Street and SW 18th Street for right of way improvements, single lane closure with flagging, 3/15/21 – 5/1/21, 7 a.m. – 4 p.m.
  • Newport Avenue at NW 10th Street for infrastructure installation, Night work with full road closure with detour, 3/21/21 – 4/13/21, 8 PM – 7 AM
  • NW 10th Street at Newport Avenue for infrastructure installation, full road closure, 3/21/21 – 4/13/21

Cierres de carreteras previstos:

  • NW Nashville Ave between NW Drake Road and NW Newport Ave for infrastructure installation, full road closure, starting 4/5/21

Work schedules are dependent on weather conditions and other factors.

 

Contact: Kyle Thomas, Construction Manager

541-323-8519, kthomas@bendoregon.gov

 

For Street Preservation related questions: Paul Neiswonger, Streets Supervisor

541-317-3035, pneiswonger@bendoregon.gov

 

Los cierres y desvíos en Bend se actualizan semanalmente en: bendoregon.gov/traffic

Encuentre más información sobre las operaciones en las calles en: bendoregon.gov/streetpreservation

Los informes semanales se pueden recibir por correo electrónico suscribiéndose a los Informes semanales sobre carreteras y tráfico en: bendoregon.gov/enews

Silla de ruedas

Información sobre alojamiento para personas con discapacidad

To obtain this information in an alternate format such as Braille, large print, electronic formats, etc. please contact Anne Aurand at 541-388-5573 or aaurand@bendoregon.gov.

Ver todas las noticias