Weekly Road and Traffic Report for the Week of Octubre 17 – 23
For the Week of Octubre 17 – 23:
- NW McKay Avenue between NW Riverfront Street and NW Riverside Boulevard for asphalt restoration, full road closure with local access, 10/20/22
- Hawes Lane between both legs of Gary Drive for a sewer service installation, full road closure with detour, 10/17/22
- Pettigrew Road between Pinehaven Avenue and Woodhaven Avenue for road grading, single lane closure with flagging (expect delays), 10/20/22 – 10/21/22
Ongoing Closures:
- Newport Corridor Improvements Project – Newport Avenue between 12th Street to 14th Street will be opening in the afternoon of Octubre 14.
To give the community some much needed relief of construction impacts and to minimize inconveniences during the holidays, two-way traffic will be maintained through the end of the year with work only happening on the shoulder. In Enero, Segment 4 (14th Street roundabout and Newport Avenue up to Knoxville Boulevard) will be closed to traffic and construction will commence on the final segment. The entire Newport corridor is anticipated to be completed in Mayo 2023, weather permitting.
- 13th Street, between Newport Avenue and Milwaukee Avenue, will remain closed to allow for construction of the stairways and sidewalks, block walls, and landscaping work remaining in this segment. Visit Newport Corridor Improvements Project webpage for more information.
- Wilson Corridor Improvements Project – Street improvements on Wilson from Second Street to 15th Street. For more information visit the Wilson Project website. This is a multiphase project with various intersections and road closures throughout its entirety.
- SE Wilson Avenue between SE 9th Street and SE 15th street, Eastbound Lane closure with detour, 7/25/22 – fall 2022.
- Brosterhous Road between SE Orchard Grass Place and Windsor Drive for infrastructure installations, full road closure with detour (Pedestrian and bike access), 10/5/22 – Diciembre 2022. For more information visit the Brosterhous Accessibility Improvements Project webpage.
- NW Glen Road between NW Rocklyn Road and NW Dohema Road for water infrastructure replacement, full road closure with local access only, 10/12/22 – 10/26/22
- Pacific Power infrastructure upgrades – Work along NW Portland Avenue with single lane closures and flagging (expect delays). The work will begin 9/26/22.
- Deschutes Market Road between Yeoman Road and Monticello Drive for Frontage improvements for Solis at Petrosa, northbound lane closure with detour, 8/29/22 – late Octubre 2022
- ODOT Third Street Improvements – Infrastructure improvements along Third Street from Butler Market Road to Greenwood Avenue. Various types of traffic control will be implemented during construction. Expected to be completed at the end of summer 2023. Street sections affected listed below.
- Single-lane closures in the Northbound and Southbound lanes on Third St. Between Greenwood Avenue and NE Olney Avenue
- Butler Market to Mervin Sampels southbound slow lane closure
- Intersection of Greenwood Avenue and Third Street, lane closures in place Domingo – Jueves Night 7pm – 7am. Expect Delays.
Cierres de carreteras previstos:
- Pettigrew Road between Pinehaven Avenue and Woodhaven Avenue for road paving, single lane closure with flagging (expect delays), 10/24/22 – 10/25/22
Los horarios de trabajo dependen de las condiciones meteorológicas y otros factores. Extreme siempre las precauciones en las zonas de obras. Los conductores deben utilizar las rutas de desvío designadas. Las calles residenciales cercanas son solo para tráfico local.
Contacto:
Deedee Fraley, Assistant City Engineer
541-385-6199, dfraley@bendoregon.gov
Para preguntas relacionadas con la conservación de las calles:
Paul Neiswonger, Streets Supervisor
541-317-3035, pneiswonger@bendoregon.gov
Los cierres y desvíos en Bend se actualizan semanalmente en: bendoregon.gov/traffic
Encuentre más información sobre las operaciones en las calles en: bendoregon.gov/streetpreservation
Los informes semanales se pueden recibir por correo electrónico suscribiéndose a los Informes semanales sobre carreteras y tráfico en: bendoregon.gov/enews
Información sobre alojamiento para personas con discapacidad

To obtain this information in an alternate format such as Braille, large print, electronic formats, etc. please contact Anne Aurand at 541-388-5573 or aaurand@bendoregon.gov.
Ver todas las noticias