- Murphy Road between Brookswood Boulevard and S Highway 97 (Business) for striping, single lane closure with flagging, Sept. 18.
- NW Arizona Avenue between NW Staats Street and NW Sisemore Street for paving, alternating lane closures, Sept. 16.
Ongoing Closures:
- SW Simpson Avenue between SW 18th Street and SW 15th Street will have infrastructure installations, single lane closure with flagging, Sept. 9 – 13.
- SE Daly Estates Drive between SE Capella Place and Se Reed Market Road for a sewer main installation, full road closure with local access only, Sept. 9 – 20.
- SW Century Drive between SW Simpson Avenue and SW Colorado Avenue for a mini roundabout construction, full road closure with detour, Sept. 9 – Nov. 15.
- NE Lytle Street between NE Quimby Avenue and NE Penn Avenue for a water main replacement, full road closure with local access only, Sept. 4 – 26.
- Awbrey Butte Waterline Improvements Project, Phase 2 – This project will provide water distribution system upgrades to the Awbrey Butte area with eight interrelated water improvement subprojects. For more information, visit the Awbrey Butte Waterline Improvements Project website.
- Trenton Avenue from Juniper Street to 12th Street: Local access only for installation of water line and franchise utility (GAS) work. Traffic to detour using Iowa Avenue and West Hills Avenue.
- Portland Avenue from Awbrey Road to Steidl Road: Single Lane closure under flaggers for franchise utility (GAS) work.
- Midtown Crossing Project (Second Street work) – A multiphase project that will replace the water main from Greenwood Avenue to Franklin Avenue in preparation for the full reconstruction occurring next spring. Phase 1 occurs from Aug. 15 – Oct. 15. Road closures with local access will occur in its entirety. Current road section work listed below.
- Second Street between Greenwood Avenue and NE Hawthorne Avenue.
- NW Harriman Street between NW Kearney Avenue and NW Greenwood Avenue for infrastructure work associated with the Deschutes County Courthouse, full road closure, began julio 24.
- Boyd Acres Road between Brinson Boulevard and Builders Street will have frontage improvements for a private development, lane closure with lane shift, Aug. 7 – Sept. 27.
- Preservación de calles – Various streets will have repaving completed. Additional related work will take place primarily during nighttime hours. Expect some full street closures with limited local access and delays through Octubre 16 (weather dependent). Learn more at the Street Preservation webpage.
- Riverside Boulevard between the Galveston Bridge and W Broadway Street, full nighttime closures, Sept. 17 and 18.
- NE Division Street between NE Revere Avenue and NE Third Street, full nighttime closures, Sept. 18-19.
- NE Butler Market Road between Highway 20 and BNSF railroad, full nighttime closure including offramp from highway, Oct. 14 and15.
- NW 12th Street between Iowa and Trenton Avenue, full nighttime closures, Oct. 15 – 16.
- NE Quimby Avenue between NE Fifth Street and NE Seventh Street will have a water main replacement, full road closure with local access only, julio 8 – mid Sept.
- Parrell Road between Badger Road and Silver Sage Street will continue infrastructure improvements, southbound lane closure with detour (northbound will remain open), julio 1 – Sept. 9.
- NW Crossing Farmers Market – special event occurring every Sábado junio 1 – Oct. 12. Multiple road closures related to event (listed below).
- NW Crossing Drive between Mount Washington Drive and NW Crossing Drive (Circle).
- NW John Freemont between NW Ordiway Avenue and NW Fort Clatsop Street.
- NW Fort Clatsop Street between NW Ordway Avenue and NW John Freemont Street.
- Silver Sage Sewer Project – The yearly project includes installing gravity sewer mains and sewer laterals to allow properties to decommission their septic systems and connect to the public sewer system. Tentatively starting on Mayo 6, 2024: Silver Sage Street; Benham Road between Murphy Road and Rae Road; Concho Street; Loy Lane; and the North-end of Tapadera Street will be closed with tentative plans for reopening in mid-Octubre 2024. Project began Mayo 1, 2024. For more information, visit the Silver Sage Sewer Project webpage.
Los horarios de trabajo dependen de las condiciones meteorológicas y otros factores. Extreme siempre las precauciones en las zonas de obras. Los conductores deben utilizar las rutas de desvío designadas. Las calles residenciales cercanas son solo para tráfico local.
Si hay algún cierre de carretera que no figure en este informe, envíe una solicitud de servicio para notificar al ayuntamiento cualquier obra potencialmente no autorizada dentro del derecho de paso de la ciudad. Visite el Departamento de Transporte y Movilidad para enviarla.
Contacto:
Deedee Fraley, Assistant City Engineer
541-385-6199, dfraley@bendoregon.gov
Para preguntas relacionadas con la conservación de las calles:
Paul Neiswonger, Streets Supervisor
541-317-3035, pneiswonger@bendoregon.gov
Los cierres y desvíos en Bend se actualizan semanalmente en: bendoregon.gov/traffic
Encuentre más información sobre las operaciones en las calles en: bendoregon.gov/streetpreservation
Los informes semanales se pueden recibir por correo electrónico suscribiéndose a los Informes semanales sobre carreteras y tráfico en: bendoregon.gov/enews
Información sobre alojamiento para personas con discapacidad

To obtain this information in an alternate format such as Braille, large print, electronic formats, etc. please contact Jacob Larsen at 541-647-0696 or jlarsen@bendoregon.gov
Ver todas las noticias